CABLE TRAY SYSTEMS (LIGHT / MEDIUM / HEAVY DUTY)

Unistrut’s load testing is in accordance with CEVIEC 61537:2001. In practical terms this covers continuous mult span installations, ‘evenly loaded along the length of and across the full width of the tray.

The end spans in these installations should be reduced to 0.75 of the intermediate spans.

Note: Please follow manufacturer datasheets and guidelines for cable usage and installation.

For further assistance,
please reach out to a member of the Phoenix Sales Team.

Get a Quick Quote